Deploy scalable, grid-intelligent charging stations with smart load balancing, real-time analytics, and seamless fleet management. Built for municipalities, businesses, and multi-unit dwellings.
150kW DC Fast
OCPP 1.6J
UL/CE Certified
Smart hardware meets intelligent software for a charging experience that scales with your business.
AI-driven power distribution prevents grid overload while maximizing charging speed across multiple stalls simultaneously.
Monitor utilization, revenue, energy consumption, and station health from a unified cloud platform accessible anywhere.
Integrate seamlessly with existing property management, parking systems, or corporate fleet software via RESTful APIs.
Pair with Verdantix solar arrays or battery storage to enable 100% green charging and peak shaving capabilities.
Support for RFID, mobile app, plug-and-charge (ISO 15118), and open roaming networks like PlugShare and ChargePoint.
Remote diagnostics, OTA firmware updates, and predictive alerts reduce downtime by up to 85%.
Enterprise-grade hardware built for reliability, compliance, and rapid deployment.
| Feature | Details |
|---|---|
| Connector Types | CCS2, Type 2, CHAdeMO (modular) |
| Power Output | AC: 7-22kW | DC: 50-150kW (configurable) |
| Communication | OCPP 1.6J (JSON), 4G/LTE, Ethernet, Wi-Fi |
| IP Rating | IP54 / IP65 options (weatherproof) |
| Payment Systems | Integrated card reader, contactless, mobile wallet |
| Certifications | UL 2594, IEC 61851, ISO 15118, CE, RoHS |
| Dimensions (V-150) | 680 × 240 × 1850 mm | 85 kg |
| Operating Temp | -30°C to +55°C with active thermal management |
Designed to work with your existing energy and property infrastructure.
Direct coupling with Verdantix battery systems enables off-grid operation, time-of-use optimization, and backup power resilience.
API-driven access control, session tracking, and automated billing that syncs with major property management platforms.
V2G capable, demand response compatible, and utility-integrated for dynamic pricing and grid stabilization programs.
Flexible models tailored to site size, usage patterns, and growth trajectory.
Site surveys and engineering take 2-4 weeks. Physical installation typically requires 1-3 weeks depending on site preparation and electrical panel upgrades. We manage permits and utility coordination end-to-end.
Yes. All V-Series stations support ISO 15118-2 for seamless plug-and-charge authentication, RFID fallback, and mobile app activation for maximum user convenience.
Our cloud platform continuously monitors site capacity and vehicle SOC. It dynamically allocates power across connected stalls, ensuring optimal charging speed without tripping breakers or requiring expensive transformer upgrades.
Absolutely. We are OCPP 1.6J compliant and offer native connectors for ChargePoint, Greenlots, Hubject, and Open Charge Alliance networks for seamless roaming and revenue expansion.
Schedule a free site assessment and receive a custom deployment proposal within 48 hours.